It is a recommended best practice to run through a series of tests to verify that an installation has completed successfully in your environment. This article outlines some initial tests that can be performed to assist with this verification.
Prerequisites
It is a prerequisite that all the steps in the BrightWork 365 Product Installation Guide have completed successfully and without error.
Post Install Checklist
All items on the checklist should pass. If any items fail, please check your Power Platform logs for issues and if necessary, contact BrightWork 365 Support.
Requests
- Go to the Requests section on the main nav and create a new request.
- Verify that all notification emails are received, and that a project was created successfully from the request.
Projects
Open the project created in the previous section and complete the following steps:
- Verify project details were carried over from the request correctly. Add any additional required field values and save the changes.
- Click the Gantt tab and add at least one task for each of the available task types, e.g., Stage, Task, and Deliverable.
- Assign yourself to at least one task.
- Set initial Start and Finish dates. Save the changes, wait a few seconds, and click Refresh.
- View the Status tab in the project and verify the Start and Finish dates match the values in the Gantt.
- Click the Project Settings tab, select Reset Target Dates to reset the Baseline, and click Save.
- Refresh the page and click on the Gantt tab.
- Click Baseline and confirm it has been updated to match current Gantt dates.
- Click the Status tab and confirm the Target Dates updated to match the dates in the Gantt.
- Click the Team tab and verify you have been added as a team member.
- Click the My Work tab and verify that your task is displayed in My Work with the correct Start and Finish dates.
- Click the Status tab. Make some changes in the Indicators section of the Status tab and save.
- Click the Status Reports tab and click + New Status Report. Enter status details and select Email Report to Sponsor and Complete Status Report, and then click Save & Close. The Status report should be presented in the next screen.
- Open the Status report and verify it matches what was updated.
- Verify the Project Sponsor receives an email with the same report details.
- Click the Documents tab, add a document, and save and close the document.
- Verify you can reopen the document without error.
Power BI Dashboards (if applicable to your organization)
- Confirm that at least one project with Gantt tasks and assignments has been created and saved, and that the Power BI refresh cycle has run.
- Click Dashboards on the main nav.
- View all the dashboards and confirm the data is presented as expected.
Microsoft Teams (if applicable to your organization)
- Create a new Team in the Microsoft Teams app.
- In BrightWork 365 go to Programs on the main nav, click into the program associated with the project you created earlier.
- Click Program Settings.
- Click Update Teams List.
- Wait a short time and click the Statement tab.
- Start typing the name of your new Team, select the Team, and click Save.
- Open the project you created earlier.
- Configure the project for Microsoft Teams by clicking into the Project Settings tab and selecting Create Teams Channel.
- After waiting for the associated flow to run, click the Charter tab of the project and verify the Channel is displayed in the Teams Channel field.